Bug places events one day back upon editing.
I create an event or make a change to an existing one. Calendar places the event one day behind.
Steps to reproduce:
- Open GNOME Calendar
- Edit an event to make its date '25th november 2018'
- Click 'done'
- Watch as the event date goes backwards one day to '24 november 2018'
This happened on 2 installations of Arch on the same machine, both clean installs.