Project wide configuration option for type of tasks (work or time fixed)
Submitted by Santiago Erquicia
Link to original bug (#151762)
Description
I would like to have a project or planner wide setting to establish if new tasks are going to be work based or time based (fixed). I think that MS Project has it.
If you don't have that possibility, you end up changing every task to set it as duration fixed.
Version: 0.12