wacom: Update to newer "output" setting

The semantics are pretty much the same for opaque tablets, not
much else to do here.
11 jobs for carlosg/tablet-outputs in 2 minutes and 48 seconds (queued for 3 seconds)
Status Job ID Name Coverage
  Build
passed #162281
build

00:01:50

 
  Test
failed #162283
asan

00:00:57

failed #162282
test

00:00:41

 
  Manual
skipped #162288
allowed to fail manual
armv8
skipped #162284
allowed to fail manual
flatpak
skipped #162287
allowed to fail manual
msan
skipped #162289
allowed to fail manual
ppc64le
skipped #162285
allowed to fail manual
tsan
skipped #162286
allowed to fail manual
ubsan
 
  Review
skipped #162290
allowed to fail manual
review
skipped #162291
allowed to fail manual
stop_review
 
Name Stage Failure
failed
test Test
FAIL:       1
SKIP: 0
TIMEOUT: 0

Uploading artifacts...
./*.log: found 1 matching files
_build/meson-logs/: found 3 matching files

Uploading artifacts to coordinator... ok
id=162282 responseStatus=201 Created token=yWzoAimS
ERROR: Job failed: exit code 1
failed
asan Test
Full log written to /builds/GNOME/gnome-control-center/_build/meson-logs/testlog.txt
FAILED: meson-test
/usr/bin/meson test --no-rebuild --print-errorlogs
ninja: build stopped: subcommand failed.
Uploading artifacts...
./*.log: found 1 matching files
_build/meson-logs/: found 4 matching files

Uploading artifacts to coordinator... ok
id=162283 responseStatus=201 Created token=unsbDzox
ERROR: Job failed: exit code 1