Dates for all-day events in the Sidebar might sometimes be offset by 1 day for `VALUE=DATE` events
Gnome Calendar 46.0
Arch Linux Gnome Calendar 46.0
Bug summary
ICS file loaded to calendar shows incorrect date in left sidebar in Gnome Calendar 46.0
Please find the screenshot below and compare the dates in the grid and the dates in the left sidebar.
Sample ICS file attached in case its required
Steps to reproduce
i. Load any ICS Calendar file offline in Gnome Calendar 46. ii. Look for the Dates in the sidebar for the event. iii. It is always the event date+1 instead of event date as shown in color code in the left sidebar of Gnome calendar
Please let me know if i need to make any other corrections or attach debugs for the bug to be clear or help with reproducing it.
Edited by Debasish Patra