Evolution EWS Calendar exceeds maximum supported size
Evolution / EWS / Data-Server 3.52.0 on Arch Linux (kernel 6.8.2)
I have a work Office365 EWS connected to Evolution. Everything worked great until recently when my main Calendar from that profile stopped syncing correctly. Everytime it gets refreshed it shows the following message:
The calendar backend servicing “Calendar” encountered an error.
The reported error was “The message exceeds the maximum supported size., The message exceeds the maximum supported size.”.
I am pretty sure it started happening with one of the latest updates but it could also be something else. I am looking for ways to debug this, maybe find the specific calendar event that is causing the message size error. I was unable to do so with EWS_DEBUG=2
so far.
I found a related issue evolution-data-server#509 (comment 1941368), but I don't have a hint on what event (or event series) could be causing it at all.
Thank you all in advance!